Test environment — please do not tamper with other tenants' data. Synthetic sessions only.
Back to charge points

chembur

chembur(19.0548, 72.8980)

unregistered

Overview

Registered May 3, 2026, 12:44 AM
Vendor
siri
Model
240
Serial number
005
Firmware
OCPP version
1.6J
Station max kW
382(sum of connectors)
Last heartbeat
Last boot notify
Number of connectors
4

Publish state

Dashboard scaffold; OCPI / driver-app effects wire up at Phase 1.

Mark this charger "live" once it’s ready for real drivers. Today the toggle just gates dashboard visibility + sets published_at; real downstream effects (driver-app map discovery, OCPI 2.2 location push) wire up at the OCPI Phase 1 deadline window (Jul-Aug 2026).

Currently unpublished — visible to operators only.

Update status

Quick status change — equivalent to PATCH /charge-points/019dea1d…/status. For full edit (identifier / vendor / location), open the edit form. Connector-graph edits are on the backlog.

Effective tariff

The tariff currently applied to this charger, walked along the precedence chain (charger → site → customer → tenant).

No tariff is currently bound to this charger or any of its parent scopes. Drivers can’t be billed until a sell tariff version is assigned.

Charger-level override

A charger-level binding wins over the site / customer / tenant fallbacks. Useful for one-off pricing on a specific charger.

Test the bound tariff

Run a synthetic session against this charger to validate that the configured tariff produces the expected bill. No real charger needed.

Open test session →

Connectors(4)

#1 · CCS2
DC
available
Max kW
240
Last status
#2 · Type 2
AC · 3-phase
available
Max kW
22
Last status
#3 · CCS2
DC
available
Max kW
60
Last status
#4 · CCS2
DC
available
Max kW
60
Last status